I have done a few of them myself.
How to brace a flush beam in an attic.
Floor and ceiling bowing improper support duration.
Typically either side of the new beam the walls and framing is shored up.
Cut the top plates of the wall flush with the king stud near the ends of the new beam make sure you leave about 6 of support for the new beam to bear on.
Cut the two beam members lvls 1 2 in.
Short of the overall length and cut notches at the top to fit beneath the top plates in perpendicular walls photo 9.
Then slip the beam members into place and rest them on the temporary cradles.
Bracing for extra support.
Pieces of 2 by 4 inch lumber are placed between the trusses underneath the decking to keep trusses straight.
Installing a radiant barrier in the attic.
If the attic is being finished for living space these pieces called scabs can be installed flush with the trusses to provide areas for sheetrock or paneling to be nailed to.
How to create an open concept room with a flush beam duration.
A new beam goes in.
Cut the beam to length and cut notches to clear tie plates in adjoining walls.
The old framing tied into the new beam with proper joist hangers and strong tie type connectors.