Along with your rolls of zincshield to insure correct installation.
How to attach the shield to the roof.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Fit a fire stop into the joist shield and attach it to the ceiling joist.
I am thinking about gluing the heat shield back on to the underside with blacktop roof sealant.
If the roof has multiple ridges install zincshield at the top of each ridge.
Insert the pipe into the chimney outdoor enclosure.
The highest quality sealant goes for about 10 for a canister at home depot.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
They suggest that the membrane lap down about an inch onto the face of the fascia and then up onto the roof sheathing.
Zincshield is installed at the top of the roof below the ridge cap ridge vent or below the first row of shingles.
Make a cutting on one of the sides of the horizontal roof beam on an angle.
This seals the sheathing fascia joint and blocks the water s pathway into the eaves and soffit.
The premade ones are much quicker and probably neater looking.
Attach roofing to the garage wall with bent metal flashing that goes up the wall and over the roof.
Then you put on the shingles.
Push the pipe through it to the outside of the house.
The drip edge is then installed on top of the ice barrier.
You have to do it thoroughly so that the rafters sit flush on it.
I am thinking if it is strong enough to attach r.
Many shingle guarantees require roofing felt because it makes the shingles last longer.
You can cut strips of zinc flashing copper and lead work too and slide them under a course of roof shingles to kill lichen and moss growing there or you could just buy these premade strips from shingle shield.
Be sure to order gsp 95 adhesive or zincshield nails.
Seal the top with clear caulk.
Attach the horizontal beam by using a nail gun.
If you are not using the elastomeric membrane i would put roofing paper over the entire roof.
Count the number of rafters in your space and measure the distance between a few random sets.
Cut another square opening through the roof.
After that to make it flush with the roof of the existing house cut the two outer rafters.
The heat shield ripped around the studs and it is just dangling under the car and making rattling noises.
Get the total number of rafters and multiply times 2 then add about a foot to the total length just so you don t run short.
Fourth you need to put a drip edge on the remaining sloped sides of the roof over the building paper and over the ice and water shield.