If our prime plus factory priming is not being used hardie recommends the application of an alkali resistent primer along with 100 acrylic topcoat s.
How to apply hardiplank siding.
This video will outline the basics of installing james hardie s fiber cement products.
Measure up from the ground 6 inches plus the width of one plank at a corner and make a.
After removal of the old siding new house wrap should be installed to provide a water barrier between the.
Find your most beat up pieces of siding and rip them down into 1 1 4 in.
Install these fragile starter strips with a 15 gauge trim gun.
Learn how to install hardiepanel vertical siding products.
You have two options here you can make your own or you may be able to find acceptable prefabricated third party starter strips available for purchase.
Begin at the lowest point at the side of your house where you will install your hardie siding.
Blind nail your hardie siding in place.
How to install hardie siding step 1.
You can make your own fiber cement starter strip by ripping a piece of hardieplank lap siding into 1 1 4 inch strips.
How to install hardie board lap siding preparation.
These strips installed at the bottom will make your first row of siding angle out to match the rest of the rows.
Apply a 1 1 4 inch starter strip right above the water table trim located at the bottom edge of the house wall.
Above the bottom of the wall sheathing as a guide.
James hardie products must be painted.
Installing hardiplank lap siding.